Abstract
In this study, a model is developed to investigate the implications of an hourly day-ahead competitive power market on generator profits, electricity prices, availability and supply security. An integrated simulation/optimization approach is employed integrating a multi-agent simulation model with two alternative optimization models. The simulation model represents interactions between power generator, system operator, power user and power transmitter agents while the network flow optimization model oversees and optimizes the electricity flows, dispatches generators based on two alternative approaches used in the modeling of the underlying transmission network: a linear minimum cost network flow model and a non-linear alternating current optimal power flow model. Supply, demand, transmission, capacity and other technological constraints are thereby enforced.The transmission network, on which the scenario analyses are carried out, includes 30 bus, 41 lines, 9 generators, and 21 power users. The scenarios examined in the analysis cover various settings of transmission line capacities/fees, and hourly learning algorithms. Results provide insight into key behavioral and structural aspects of a decentralized electricity market under network constraints and reveal the importance of using an AC network instead of a simplified linear network flow approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.