Abstract

With the advantage of quick response and flexible ramp, energy storage system (ESS) offers a promising capability of fast frequency control for power systems, especially under a severe disturbance. This paper proposes an ESS control strategy using local measurement in order to provide fast frequency support right after a sufficiently severe disturbance is observed. The proposed strategy includes online frequency characteristic estimator and online optimization controller. Distinguished from existing approaches, no prior knowledge of power system model is required in this work, including generator configuration, operation condition, and frequency response of each component. Instead, the overall system frequency characteristic is approximated online by the proposed estimator. Then, the power setpoint of ESS is determined adaptively to participate in frequency control by the proposed model predictive controller. Finally, the effectiveness of the proposed method is verified via real-world data of a provincial power grid in China.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call