Abstract

This paper develops a model predictive control (MPC) framework to co-optimize switching sequences and control inputs for switched linear systems subject to persistent dwell-time (PDT) constraints. As a class of time constraints, PDT has been demonstrated to be more general and flexible than others like dwell-time or average dwell-time. Although time constraints are widely used in applications for safety and stability concerns, MPC of switched systems with time constraints often formulates a mixed- integer nonlinear program which cannot obtain the optimal solution in polynomial time, and thus suffers from the loss of recursive feasibility and stability. To address this problem, we propose several novel techniques: (i) the construction of the terminal sets based on two constraint admissible PDT contractive sets, (ii) the introduction of PDT and historical constraints, (iii) the use of two non-globally optimal solutions, and (iv) the prolonged prediction horizon. It is the first time that MPC approaches are applied to the co-optimization problem of switched systems under time constraints with guaranteed recursive feasibility and stability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.