Abstract

Focusing on the parameter “Multiple” of CPPI strategy, this study proposes a dynamic setting model of multiple for gap risk management purpose. First, CPPI gap risk is measured as the probability that the value loss of active asset exceeds its allowed maximum drop determined by a given multiple setting. Moreover, according to the statistical estimation using SV-EVT approach, a dynamic choice of multiple is detailed as a function of time-varying asset volatility, expected loss, and the possibility of occurrence of extreme events in the active asset returns illustrated empirically on Shanghai composite index data. This study not only enriches the literature of dynamic proportion portfolio insurance, but also provides a practical reference for CPPI investors to choose a moderate risky exposure achieving gap risk management, which promotes CPPI’s application in emerging capital market.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.