Abstract

Aiming at the problems of poor periodicity of workshop material distribution, difficult prediction of station material demand time node, and redundant distribution route, this paper proposes a model construction method of material distribution system based on digital twin. Build a material distribution control mode based on digital twin, and establish a full-cycle material distribution mechanism on this basis to comprehensively optimize the distribution cycle from the material preparation stage, dynamic replenishment stage, and data transmission stage of adjacent distribution cycles. Build the digital twin model of material distribution system, establish the material demand time node dynamic prediction operation mechanism based on LSTM, accurately predict the station material demand time node, establish the material distribution route optimization model with the lowest total cost, and optimize the AGV route. Finally, it is applied to the asynchronous line workshop of A enterprise to verify the effectiveness of this method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.