Abstract

A lab-scale granular sludge sequencing batch reactor (G-SBR) system was operated using synthetic wastewater. The total nitrogen removal efficiency of 85% was obtained together with the achievement of complete total phosphorus removal with average granule diameter of 400µm. Dual-step nitrification and denitrification model with fixed biofilm thickness was used for performance analysis. The denitrification mode only contributed to TN removal with 25% which can be calculated with process stoichiometry. The remaining nitrogen removal could be explained by simulating simultaneous nitrification and denitrification which was responsible for 75% denitrification during aerobic period. In addition, low NO3- concentration at the beginning of the fill period provided advantage for securing a prolonged anaerobic period for enhanced biological phosphorus removal (EBPR). The model parameters of boundary layer thickness (zBL = 50µm) and half-saturation of O2 for nitrite-oxidizing bacteria (KO2,NOB = 0.5 gO2/m3) were tuned to fit NO2 and NO3 profiles in SBR cycle.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call