Abstract
Rapidly decreasing battery prices and high capacity prices on the German primary control reserve (PCR) market promote the attractiveness of battery energy storage systems (BESS) for primary control provision. In order to assess the economic feasibility in this application field, two case studies based on a 2 MWh BESS are performed. By coupling a PCR simulation model with a battery aging model, battery lifetimes are estimated. Costs and revenues occurring during the lifetime are calculated using the net present value approach. The results indicate that a BESS with a power-to-energy ratio of 1:2 is not economically feasible under the current framework. A BESS with a power-to-energy ratio of 1:1 will break even after approximately nine years of operation. Decreasing battery system prices are likely to increase the price pressure on the PCR market leading to decreasing revenues for PCR supply. Battery aging results suggest similar aging behavior for both systems presented due to the prevalence of shallow DoD cycles and the resulting predominance of calendar aging.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.