Abstract

Predictive maintenance techniques are getting increasing interest in industry because instrumental to determine suitable reliability conditions of in-service equipment aimed at smartly establishing when a maintenance operation should take place. This approach presents economic benefits when compared to more traditional routines or time-based preventive maintenance because tasks are performed only when warranted. Within this context, this work presents a control allocation scheme based on Model Predictive Control ideas to deal with actuator loss of effectiveness related to their usage. These undesired events occur when the associated degradation effects, whose evolution is assumed to be measurable and/or predictable, overcome a given threshold. The proposed scheme consists of two modules: a prognostic unit in charge of monitoring the actuators’ health and a reconfigurable control allocation module whose action is based on the current actuators’ degradation level. Its main goal is to establish a suitable time interval during which a maintenance service can occur without affecting the stability of the controlled system and the feasibility properties of the control allocation scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.