Abstract

This paper presents an integrated approach for short-term supply chain management (SCM) at a fast moving consumer goods production plant. The problem is to determine the production quantities, to provide a detailed production schedule, to trigger the relevant express deliveries of raw material, and to manage the distribution. We propose a linear integer model, which integrates all of these decisions within scheduling. To find high quality solutions in a reasonable amount of time, various solution methods are proposed, such as a greedy constructive heuristic, two tabu search metaheuristics, a basic variable neighborhood search and an enhanced one, which uses a variable shaking operator. Experiments on realistic instances show that the latter method is efficient and robust. This paper is a contribution to the SCM literature (indeed, only few references address the integration of short term decisions) and to the general metaheuristics field (as the variable neighborhood search paradigm is extended).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.