Abstract

This paper investigates a two-machine group scheduling problem with sequence-independent setup times and round-trip transportation times, which is derived from the production management requirements of modern steel manufacturing enterprises. The objective is to minimize the makespan. Addressing limitations in prior studies, we consider a critical but largely ignored transportation method, namely round-trip transportation, and restricted transporter capacity between machines. To solve this problem, a mixed-integer programming model is first developed. Then, the problem complexity is analyzed for situations with both single and unlimited transporters. For the NP-hard case of a single transporter, we design an efficient two-stage heuristic algorithm with proven acceptable solution quality bounds. Extensive computational experiments based on steel plant data demonstrate the effectiveness of our approach in providing near-optimal solutions, and the maximum deviation between our algorithm and the optimal solution is 1.38%. This research can provide an operable optimization method that is valuable for group scheduling and transportation scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.