Abstract

The article considers the problems of justification of derivational micro-HPP usage for reserve water supply and standby power service of harbour installations for Russky Island. The first part of the article describes the justification of the power supply necessity for recreation facilities and yachting harbour installations (marinas) on Russky Island, including the prospect of their further development and new construction activities. The second part of the article considers the justification of innovative technologies usage of mobile derivational micro-HPP for recreation facilities and harbour installations power supply. The third part of the article deals with the principal design parameters for calculation of composite mobile diversion conduit and its cable-stayed system schemes which are used to fix the diversion conduit in light of wind effects. The forth part of the article shows the simulation modeling of the diversion conduit.

Highlights

  • Russky island mobile diversion microHPP derivational water pipeline composite materials stress-strain state of a soft shell numerical simulation

  • PART 1 / Prvi dio Russky Island, situated in the Sea of Japan, had formerly been military-oriented, but due to the decision dealing with the organization of a tourist-recreational zone on its territory and construction of infrastructural facilities, after the Asia-Pacific Economic Cooperation organization summit (APEC), has vast prospects for the development of civil infrastructure, its reserve water and power supply (Fig. 1) [1,2,3]

  • We have developed a new technical solutions for mobile derivational micro-HPP in complete with the composite derivational water pipeline made of composite materials (Fig. 2) [9]

Read more

Summary

Summary

The article considers the problems of justification of derivational micro-HPP usage for reserve water supply and standby power service of harbour installations for Russky Island. The first part of the article describes the justification of the power supply necessity for recreation facilities and yachting harbour installations (marinas) on Russky Island, including the prospect of their further development and new construction activities. The second part of the article considers the justification of innovative technologies usage of mobile derivational micro-HPP for recreation facilities and harbour installations power supply. The third part of the article deals with the principal design parameters for calculation of composite mobile diversion conduit and its cable-stayed system schemes which are used to fix the diversion conduit in light of wind effects. The forth part of the article shows the simulation modeling of the diversion conduit

KEY WORDS
Findings
KLJUČNE RIJEČI

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.