Abstract

This paper focuses on the mixed transportation network design problem. A bi-level programming model, constrained by investment budget, is developed to minimize the total impedance of transportation network. The immune clone annealing algorithm, which is designed by combining annealing tactic of simulated annealing algorithm and immune clone algorithm, is introduced to solve the proposed bi-level model. Compared with simulated annealing algorithm, the feasibility and effectiveness of the model and the algorithm is demonstrated through a numerical experiment. The sensitivity analysis on different investment budget constraints is provided, as well as the relation between investment cost and the total impedance of network, investment budget constraint, and decision on network design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.