Abstract

Production to order and production in advance have been compared in many frameworks. In this paper we investigate a production in advance version of the capacity-constrained Bertrand-Edgeworth mixed duopoly game and determine the solution of the respective timing game. We show that a pure-strategy (subgame-perfect) Nash-equilibrium exists for all possible orderings of moves. It is pointed out that unlike the production-to-order case, the equilibrium of the timing game lies at simultaneous moves. An analysis of the public firm’s impact on social surplus is also carried out. All the results are compared with those of the production-to order version of the respective game and with those of the mixed duopoly timing games.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.