Abstract
Current adaptive mixed criticality scheduling policies assume a high criticality mode in which all low criticality tasks are descheduled to ensure that high criticality tasks can meet timing constraints derived from certification approved methods. In this paper we present a new scheduling policy, Adaptive Mixed Criticality - Weakly Hard, which provides a guaranteed minimum quality of service for low criticality tasks in the event of a criticality mode change. We derive response time based schedulability tests for this model. Empirical evaluations are then used to assess the relative performance against previously published policies and their schedulability tests.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.