Abstract
The Shangdu power plant has four 600-MW turbine-generators connected to the North-China Grid through two 500-kV transmissions, which are compensated with 45% fixed series capacitors. Extensive studies conducted on the system model indicate that the system suffers from multimodal subsynchronous resonance (SSR). To solve the problem, a countermeasure is developed by combining the supplementary excitation damping control (SEDC) and the torsional stress relay (TSR). In this paper, the characteristics of the SSR problem are investigated. Then the developed SEDC is presented. To validate the effectiveness of the proposed SEDC as well as the results of model studies, field tests were conducted under various operating conditions. The tests fully exposed the realistic threat of SSR in the system. Meanwhile, it is demonstrated that the developed SEDC can improve torsional damping significantly, and thus solve the multimodal SSR problem effectively. This is the first time in China that practical SEDCs have been developed and their ability to mitigate multimodal SSR has been verified in a real series-compensated system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.