Abstract
Abstract The rise of photovoltaic (PV) penetration is contributing to the increasing incidence of overvoltage detection in the electrical grid during times of high-power generation. Overvoltage can cause disturbances or (partial) failures in the electrical supply network, since the components used are designed for a certain voltage band. One option to counteract too high voltage levels and thus ensure power quality, grid stability and resilience is the absorption of active power by means of a battery energy storage system (BESS). In this paper, we first built a suitable simulation setup for a typical European network section, including a large-scale PV system connected to the 10 kV level and a BESS model. A suitable charging and discharging algorithm for the BESS with the aim to realize peak shaving for the grid voltage was developed and implemented. Simulations, performed in MATLAB/Simulink®, show the dependence of the battery capacity and power on the grid-serving effect of BESS. By determining appropriate values for these two factors a significant reduction of the voltage level could be achieved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.