Abstract

Abstract To meet increasing water consumption with limited water resources, management approaches that transfer water between purposes must be improved for sustainable development. This entails an urgent requirement for appropriate water resources management within water–energy interaction if severe water shortage occurs occasionally. This study evaluates hydropower generation policies of a cascade reservoir system in the Be River Basin in terms of security of water supply and energy production. The Generalized Water Allocation Simulation Model (GWASIM) was applied to simulate the water use of a complex system of hydropower generation and water supply. Two water allocation scenarios and six alternatives defined by varying monthly generating hours were modeled and compared. The results demonstrate that a compromise between hydropower generation and water supply can be negotiated to reduce the severity of water shortages. Different monthly hours of hydropower generation among alternatives show an effect on improving power production and reliable water supply. This study provides overall insight into the performance of a multi-purpose cascade reservoir system. It will provide a foundation for improving future study of reservoir operations in meeting the increasing demands of water and energy in Vietnam.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call