Abstract

This article discusses an independent investigation and associated forensic analysis of the old Minneapolis highway I35W Bridge that collapsed on 1 August 2007, which is based on a thorough examination of the original design drawings, a series of detailed 2D/3D finite elements computations of the bridge and the material evidences disclosed by National Safety Transportation Safety Board (NTSB) official investigation. The results have been organised into four reports submitted to the related government agencies during the first three years after the incident. Particularly, material evidences of fatigue damages in the bridge are examined in this article.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.