Abstract

The problem addressed in this paper is defined by M parallel identical machines, N jobs with identical (unit) processing time, job-dependent weights, and a common due-date for all jobs. The objective is of a minmax type, i.e. we are interested in minimizing the cost of the worst scheduled job. In the case of a non-restrictive (i.e., sufficiently large) common due-date, the problem is shown to have a solution that is polynomial in the number of jobs. The solution in the case of a restrictive due-date remains polynomial in the number of jobs, but is exponential in the number of machines. We introduce a lower bound on the optimal cost and an efficient heuristic. We show that the worst case relative error of the heuristic is bounded by 2 and that this bound is tight. We also prove that the heuristic is asymptotically optimal under very general assumptions. Finally, we provide an extensive numerical study demonstrating that in most cases the heuristic performs extremely well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.