Abstract
A simultaneous strategy for solving the integrated planning, scheduling, and control problem considering short-term periods is proposed in this paper. The problem is formulated as a mixed integer dynamic optimization problem. The main practical motivation to use a simultaneous rather than a sequential solution strategy is to seek improved optimal solutions by considering the interactions among planning, scheduling, and control. Integration of the three levels of the problem represents a challenge given the very different horizon times involved in the operations, resulting in growth of the problem in terms of the number of equations to be solved and hence on computational requirements to carry it out. A full space approach was used rather than trying a decomposition strategy. Moreover, a nonlinear model predictive control strategy was also used to account for online product transition trajectories. The integrated planning, scheduling, and control is formulated as a mixed integer dynamic optimization model, which is tested using the dynamic models of three continuous stirred tank reactors featuring different nonlinear behavior.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.