Abstract

We consider the problem of scheduling a set of jobs on a set of identical parallel machines where the objective is to minimize the total weighted earliness and tardiness penalties with respect to a common due date. We propose a hybrid heuristic algorithm for constructing good solutions, combining priority rules for assigning jobs to machines and a local search with exact procedures for solving the one-machine subproblems. These solutions are then used in two metaheuristic frameworks, Path Relinking and Scatter Search, to obtain high quality solutions for the problem.The algorithms are tested on a large number of test instances to assess the efficiency of the proposed strategies.The results show that our algorithms consistently outperform the best reported results for this problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.