Abstract

Waste minimization strategies and the relative significance of construction waste sources were examined using a survey of 24 construction firms operating in Australia. The results indicated that a sizeable proportion of respondent firms did not have specific policies for minimizing waste. Furthermore, while a majority of firms with specific waste minimization policies made efforts to minimize waste at source, i.e. to avoid generating waste in the first place, this minimization was limited to waste generated by site offices and amenities. Potential scope exists for improving the effectiveness of waste minimization at source by addressing the sources of all waste generated during the construction phase. The survey results indicated that the five most significant sources of construction waste were design changes, leftover material scraps, wastes from packaging and non‐reclaimable consumables, design/detailing errors, and poor weather. Potential opportunities for minimizing the amount of waste generated on construction project sites are identified.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.