Abstract

This study addresses the problem of minimizing total tardiness on a single machine with unequal release dates. Dominance properties established in previous literatures and herein are adopted to develop branch and bound and heuristic procedures. Computational experiments were conducted to evaluate the approaches. The results revealed that the branch and bound algorithm is efficient in solving hard problems and easy problems that involve up to 50 and 500 jobs, respectively. The computational effectiveness of the heuristic is also reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.