Abstract

We study a scheduling problem with linear deterioration of job processing times. We consider parallel identical machines. The objective is minimum total load, i.e., minimum total processing times on all the machines. We propose a simple heuristic of a greedy type for this NP-hard problem. A lower bound based on the geometric mean of the job deterioration factors is also introduced. The greedy heuristic is shown to guarantee an optimal solution for small size problems, and our numerical tests indicate that in general it produces very close-to-optimal schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.