Abstract

As a measure of variation, total absolute deviation of job completion times (TADC) has received relatively little attention in scheduling literature. Minimizing TADC on a single machine was shown to have a polynomial time solution. In this note, we extend TADC in two directions: (i) we allow position-dependent processing times and (ii) we consider parallel identical machines. We show that each of these two more general problems, and TADC with both extensions remain polynomially solvable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.