Abstract

This paper addresses a certain type of scheduling problem that arises when a parallel computation is to be executed on a set of identical parallel processors. It is assumed that if two precedence-related tasks are processed on two different processors, due to the information transferring, there will be a task-dependent communication delay between them. For each task, a processing time, a due date and a weight is given while the goal is to minimize the total weighted late work. An integer linear mathematical programming model and a branch-and-bound algorithm have been developed for the proposed problem. Comparing the results obtained by the proposed branch-and-bound algorithm with those obtained by CPLEX, indicates the effectiveness of the method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.