Abstract

This study investigates a resource-constrained scheduling problem to minimize the total weighted completion time. A set of jobs is to be processed on a single machine subject to the limited availability of a single-type resource. An initial level of the resource is provided to support the processing of the jobs. Each job requires an amount of the resource to commence its processing, and returns an amount of the resource back to the resource pool when its processing is finished. The amount of the resource consumed and that returned by each job may not be identical. Minimizing the total weighted completion time under this resource-constraint setting is known to be strongly NP-hard. In this study, we propose several optimality dominance properties, a lower bound and two approximate bounds for developments of branch-and-bound-based approximation algorithms. Heuristic algorithms and subsequent improvement procedures are deployed to produce initial upper bounds for the branch-and-bound-based approximation algorithms. We conduct computational experiments to appraise the performance of the proposed properties and algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call