Abstract

The work shows the possibility to select the permanent configuration of a primary distribution network at which power losses during a week with maximum load and during a week with minimum load the power losses would be close to losses at optimum hourly reconfiguration. Data on the mix of loop branches obtained during the reconfiguration algorithm operation is used for selecting the tie-switches that allow both the regime restoration after emergency opening of a sectionalized switch, and acceleration of this process, especially if the tie-switch is remotely-controlled. The IEEE 33-node test systems are used to demonstrate the proposed algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.