Abstract
In this paper, we consider a parallel machine environment when all jobs have the same processing time and arbitrary release dates and deadlines of the jobs are given. We suppose that the available number of machines, which can be used simultaneously, may vary over time. The aim is to construct a feasible schedule in such a way that the maximal number of simultaneously used machines is minimal. We give a polynomial algorithm for this problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have