Abstract
This paper deals with the scheduling problem of minimizing the makespan on two identical parallel machines with molds as resource constraints. Two or more jobs with the same mold requirement cannot be processed on the same or different machines at the same time. While quite common in practice, like in wafer fabrication, such problems have not received much attention in the literature. Since this problem is NP-hard, a mathematical model for solving it is derived and tested. Moreover, three simple, fast, and effective heuristics are proposed with a worst-case performance ratio of 3/2. Computational results show that the proposed heuristics can efficiently obtain good solutions for problem instances containing a large number of jobs. In addition, the use of these proposed algorithms as initial solution can improve the performance of metaheuristics. Furthermore, the solutions obtained by these proposed heuristics can be improved by metaheuristics.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.