Abstract

In this paper the one-machine scheduling problem with linear earliness and tardiness costs is considered. The cost functions are job dependent and asymmetric. The problem consists of two sub-problems. The first one is to find a sequence of jobs and the second one is to find the job completion times that are optimal for the given sequence. We consider the second sub-problem and propose an algorithm solving the problem in O ( n log n ) time.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call