Abstract

In this article the problem of minimizing the completion time variance in n-job, single-machine scheduling is considered. The release times for all jobs are assumed to be zero. A new quadratic integer programming formulation is introduced. A Lagrangian relaxation (LR) procedure is developed to find a lower bound (LB) to the optimal objective value. When the number of jobs is between 100 and 500, our computational study shows that the lower bounds obtained by the LR procedure are very close to the best known objective values. A new heuristic algorithm is also described. The first phase of the heuristic algorithm is a construction procedure whose purpose is to identify a good initial sequence. The second phase is an improvement procedure based on pairwise interchanges. The new heuristic algorithm provides improved solutions compared to the best known heuristic.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.