Abstract

Suppose that we are given n persistent tasks (jobs) that need to be executed in an equitable way on m processors (machines). Each machine is capable of performing one unit of work in each integral time unit and each job may be executed on at most one machine at a time. The schedule needs to specify which job is to be executed on each machine in each time window. The goal is to find a schedule that minimizes job migrations between machines while guaranteeing a fair schedule. We measure the fairness by the drift d defined as the maximum difference between the execution times accumulated by any two jobs. Since jobs are persistent we measure the quality of the schedule by the ratio of the number of migrations to time windows. We show a tradeoff between the drift and the number of migrations. Let n = qm + r with 0

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.