Abstract

This paper focuses on a machine scheduling problem having applications in truck scheduling at transshipment terminals. Jobs increase and decrease, respectively, the level of a central inventory. Naturally, jobs decreasing the inventory level can be processed only if the level of the inventory is high enough not to drop below zero. We consider the problem to find a schedule for jobs such that the maximum lateness among all jobs is minimized. We develop properties of optimal solutions, lower bounds, and heuristic methods in order to find upper bounds. These are incorporated in four branch and bound algorithms that are based on fixing sequences of jobs in forward or backward direction in two different types of representations. By means of a computational study, we compare these approaches with each other in order to show their efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.