Abstract

In confronting the “Memory Wall”, the design of embedded vision systems exhibits many challenges regarding design cost, energy consumption, and performance. This paper considers a variant of the Job Shop Scheduling Problem with tooling constraints, arising in this context, in which the completion time (makespan) is to be minimized. This objective corresponds to the performance of the produced circuit. We discuss different formulations using integer linear programming and point out their characteristics, namely the size and the quality of the linear programming relaxation bound. To solve this scheduling problem with large size, we compare various approaches, including a Constraint Programming model, two constructive greedy heuristics, two models of LocalSolver, a Simulated Annealing algorithm, and a Beam Search algorithm. Numerical experiments are conducted on 16 benchmark instances from the literature and 12 real-life non-linear image processing kernels for validating their efficiency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call