Abstract

This paper focuses on an m -machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, routes of all jobs are identical as in ordinary flowshops, but the jobs must be processed multiple times on the machines. We present heuristic algorithms, which are modified from well-known existing algorithms for the general m -machine flowshop problem or newly developed in this research. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems and results are reported.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.