Abstract

The [Formula: see text]-job and [Formula: see text]-machine permutation flow shop scheduling problem with a proportional deterioration is considered in which all machines process the jobs in the same order, i.e., a permutation schedule. A proportional deterioration means that the job deterioration as an increasing function that is proportional to a linear function of time. The objective is to minimize the makespan, i.e., the maximum completion time. When some dominant relationships between [Formula: see text] machines can be satisfied, we show that some special cases of the problem can be polynomial solvable. For the general case, we also propose a heuristic algorithm and give the computational experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.