Abstract
This paper studies two models of two-stage processing with flowshop at the first stage followed by open shop at the second stage. The first model involves multiple machines at the first stage and two machines at the second stage, and the other involves multiple machines at both stages. In both models, the objective is to minimize the makespan. This problem is NP-complete, for which an efficient heuristic solution algorithm is constructed and its worst-case performance guarantee is analyzed for both models. An integer programming model and a branch and bound algorithm are proposed for model 1 and a lower bound is developed for model 2 as benchmarks for the heuristic algorithms. Computational experiences show that the heuristic algorithms consistently generate good schedule and the branch and bound algorithm is much efficient than the integer-programming model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.