Abstract

We consider the problem of scheduling jobs on two parallel identical machines where an optimal schedule is defined as one that gives the smallest total flowtime (the sum of the completion time of all jobs) among the set of schedules with optimal makespan (the completion time of the latest job). Utilizing an existing optimization algorithm for the minimization of makespan, we propose an algorithm to determine optimal schedules for this problem. We empirically show that the proposed algorithm can quickly find optimal schedules for problems containing a large number of jobs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.