Abstract

Energy consumption has become a key concern for manufacturing sector because of negative environmental impact of operations. We develop constructive heuristics and multi-objective genetic algorithms (MOGA) for a two-machine sequence-dependent permutation flowshop problem to address the trade-off between energy consumption as a measure of sustainability and makespan as a measure of service level. We leverage the variable speed of operations to develop energy-efficient schedules that minimize total energy consumption and makespan. As minimization of energy consumption and minimization of makespan are conflicting objectives, the solutions to this problem constitute a Pareto frontier. We compare the performance of constructive heuristics and MOGAs with CPLEX and random search in a wide range of problem instances. The results show that MOGAs hybridized with constructive heuristics outperform regular MOGA and heuristics alone in terms of quality and cardinality of Pareto frontier. We provide production planners with new and scalable solution techniques that will enable them to make informed decisions considering energy consumption together with service objectives in shop floor scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.