Abstract

A hybrid differential evolution (HDE) algorithm that minimizes the total earliness and tardiness time (ET), a just-in-time objective, is studied for a single-batch-processing machine (SBPM) scheduling problem with different processing times, release times, sizes and delivery times. A hybrid differential evolution algorithm with an integrated Tabu search (TS) algorithm is proposed to improve the capacity of the neighborhood search of a differential evolution algorithm (DE). The experimental results show that the proposed HDE can obtain better an objective value than the basic DE can.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.