Abstract

This communication describes a project concerning the minimization of water use and wastewater contaminant load in an industrial setting. The location was a plant manufacturing cast aluminum parts for the automotive industry. The water used for industrial purposes was some 16 000 m 3/yr with COD values sometimes higher than 5000 mg O 2/l. After a preliminary assessment, a global reduction in industrial water consumption of 33%, by means of re-circulation of the aqueous solution used for de-molding was achieved, implying a 95% reduction in de-molding solution. To minimize water use even further, recommendations to the company included a revision of the refrigeration closed-circuit and a better control of water used for general services.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.