Abstract
The present paper investigates n×3 specially structured flow shop scheduling model with processing of jobs on given machines in a string of disjoint job blocks and with probabilities associated to the processing times of jobs. The objective is to minimize utilization time of second and third machine and also minimize the total elapsed time for processing the jobs for n×3 specially structured flow shop scheduling problem. The algorithm developed in this paper is quite straightforward and easy to understand and also present an essential way out to the decision maker for attaining an optimal sequence of jobs. The algorithm developed in this paper is validated by a numerical illustration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovative Technology and Exploring Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.