Abstract

This paper addresses the semi-online scheduling problem of minimising the total weighted completion time on a single machine, where a combination of information on jobs release dates and processing times is considered. In this study, jobs can only arrive at known future times and a lower bound on jobs processing times is known in advance. A new semi-online algorithm is presented and is shown to be the best possible for the considered problem. In order to make this statement, a new lower bound on the competitive ratio of any semi-online algorithm for the problem is developed and, using competitive analysis, the proposed semi-online algorithm is shown to have a competitive ratio that matches the lower bound.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call