Abstract

The rapid growth of distributed manufacturing in industry today has recently attracted significant research attention that has focused on distributed scheduling problems. This work studied the distributed mixed no-idle flowshop scheduling problem using makespan as an optimality criterion. To the best of the authors’ knowledge, this is the first paper to study the multi-flowshop extension in which each flowshop has mixed no-idle constraints. A novel cloud theory-based iterated greedy (CTBIG) algorithm was proposed for solving the problem. Computational experiments conducted on a set of test instances revealed that the proposed CTBIG algorithm significantly outperformed classic iterated greedy algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.