Abstract
BULOG has a duty to distribute subsidized rice for low-income society groups, which is realized in the implementation of Raskin (Beras Miskin) program, but BULOG Subdivre III Surakarta has not thought about the cost of transporting Raskin quite a lot, because the most important is the Raskin demand from all districts / City. The purpose of this study is to apply the North West Corner (NWC) method to determine the cost of Raskin distribution in Perum BULOG Subdivre III Surakarta, in order to facilitate the user in determining the initial solution and determining the allocation of the transportation. The North West Coner (NWC) method is expected to minimize the cost of Raskin distribution. The data computed is January 2017 data with distribution fee of Rp 908,444,756. The results of NWC implementation showed the results of the manual calculations significantly, NWC program, and software QM for Windows 3 is the same that is Rp 903.088.837. The calculation results prove the reduction of the cost of Rp 5.355.919 or 0.58% if applying the NWC Method. The North West Corner method can be the initial solution to minimize the cost of Raskin distribution in Perum BULOG Subdivre III Surakarta. Keywords: Minimization, North West Corner, Distribution Cost, Raskin, BULOG
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.