Abstract

ObjectiveRecent literature in ovarian cancer suggests differences in surgical outcomes depending on operative start time. We sought to examine the effects of operative start time on surgical outcomes for patients undergoing minimally invasive surgery for endometrial cancer. MethodsA retrospective review was conducted of patients undergoing minimally invasive surgery for endometrial cancer at a single institution between 2000 and 2011. Surgical and oncologic outcomes were compared between patients with an operative start time before noon and those with a surgical start time after noon. ResultsA total of 380 patients were included in the study (245 with start times before noon and 135 with start times after noon). There was no difference in age (p=0.57), number of prior surgeries (p=0.28), medical comorbidities (p=0.19), or surgical complexity of the case (p=0.43). Patients with surgery starting before noon had lower median BMI than those beginning after noon, 31.2 vs. 35.3 respectively (p=0.01). No significant differences were observed for intraoperative complications (4.4% of patients after noon vs. 3.7% of patients before noon, p=0.79), estimated blood loss (median 100cc vs. 100cc, p=0.75), blood transfusion rates (7.4% vs. 8.2%, p=0.85), and conversion to laparotomy (12.6% vs. 7.4%, p=0.10). There was no difference in operative times between the two groups (198min vs. 216.5min, p=0.10). There was no association between operative start time and postoperative non-infectious complications (11.9% vs. 11.0%, p=0.87), or postoperative infections (17.8% vs. 12.3%, p=0.78). Length of hospital stay was longer for surgeries starting after noon (median 2days vs. 1day, p=0.005). No differences were observed in rates of cancer recurrence (12.6% vs. 8.8%, p=0.39), recurrence-free survival (p=0.97), or overall survival (p=0.94). ConclusionOur results indicate equivalent surgical outcomes and no increased risk of postoperative complications regardless of operative start time in minimally invasive endometrial cancer staging, despite longer length of hospital stay for surgeries beginning after noon.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.