Abstract
ABSTRACTA comparative assessment of alternative expansion plans for the Mexican electricity generation system was made by applying the Position Vector of Minimum Regret Analysis as a decision tool. The expansion plans were ranked according to seven decision criteria which consider: internal cost, risk, diversity, external cost, foreign capital fraction, carbon-free fraction, and severe accidents. Electricity expansions were optimized by using the WASP-IV model; internal costs and externalities over a long-term planning horizon were simultaneously minimized when the external cost was added into the variable component of the operation and maintenance cost. Special attention was paid to studying the convenience of including nuclear power in the electricity expansion. The new decision analysis tool ranked the plans in terms of the minimum global regret, and results showed that the plans which added nuclear power plants were in general relatively more attractive than the plans that did not.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Energy Sources, Part B: Economics, Planning, and Policy
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.