Abstract
Manufacturing companya PT.Sinar Jatimulia Gemilang produces many types of plastic packaging, one of which is mini oreo cups.The production system in this company is based on job shop, changing product demand and limited product capacity make it difficult for the company to make a productin plan. The purpose of this research is to make a mini cup production plan to meet future demand with the aim of minimize production costs. At the initial stage a field study was conducted to obtain to required data. The data obtained through interviews with production employees from the company. Then do the literature study through books and articles from related journal as the theoretical basis used in this research. Production planning research using exponential smoothing forecasting method with α=0.6 and standard error of 617814.3 was selected with the criteria of the smallest mean square error and aggregate planning.The result of analysis I strategy of inventory level inventory cost is IDR. 441,654,900. In analysis II the strategy for variation in the number workers costs is IDR. 747,373,500. The cost for analysis III subcontracting strategy is IDR. 79,065,843,000. From the research that production cost before the calculation is IDR. 52,002,000,000 and the number of workers is 4. After the result of the research on optimization the number of workers that will be used by 2.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IJIEM - Indonesian Journal of Industrial Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.