Abstract
Mine development and operation (MDO) is a construction process in the development and operation of mines to provide areas for the construction of facilities and infrastructure such as road construction, Temporary Ore Stockpile (TOS) sites, Permanent Ore Stockpile (POS) locations, etc. The purpose of this research is to manage the mine out area in the MDO TOS planning so that it can increase nickel production at the CUU site at PT. IWIP, which is located in Central Halmahera Regency, North Maluku Province. MDO TOS planning is carried out for 2 weeks. The basic design considerations refer to the data provided by the company, such as the MDO TOS area design, topographical survey, cut and fill, laminating. Processing of MDO TOS planning data in this study used Surpac Gemcom 6.3 software. From the results of data processing, the cut volume was 14,382 BCM, the fill volume was 8,599 BCM, and the laminating volume was 20,303 BCM.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Technium: Romanian Journal of Applied Sciences and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.